About the report

ZEP has undertaken a study into the costs of complete Carbon Capture and Storage (CCS) value chains – estimated for new-build coal- and natural gas-fired power plants, located at a generic site in Northern International Energy Agency (IEA) from the early 2020s.

Utilising new, in-house data provided by ZEP member organisations, it establishes a reference point for the costs of CCS, based on a “snapshot” in time. Three Working Groups were tasked with analysing the costs related to CO2 capture, CO2 transport, and CO2 storage respectively. The resulting integrated CCS value chains, based on these three individual reports, are presented in this summary report.

Key conclusions

Post 2020, CCS will be cost-competitive with other low-carbon energy technologies

The EU CCS demonstration programme will not only validate and prove the costs of CCS technologies, but also form the basis for future cost reductions, enhanced by the introduction of second- and third-generation technologies.

The results of the study therefore indicate that post-demonstration CCS will be cost competitive with other low-carbon energy technologies as a reliable source of low-carbon power. CCS is on track to become one of the key technologies for combating climate change – within a portfolio of technologies, including greater energy efficiency and renewable energy.

CCS is applicable to both coal- and natural gas-fired power plants

CCS can technically be applied to both coal- and natural gas-fired power plants. Their relative economics
depend on power plant cost levels, fuel prices, and market positioning, whereas applicability is mainly
determined by load regime.

All three CO2 capture technologies could be competitive once successfully demonstrated

The study includes the three main capture technologies (post-combustion, pre-combustion and oxy-fuel),
but excludes second-generation technologies (e.g., chemical looping, advanced gas turbine cycles). Using
agreed assumptions and the Levelised Cost of Electricity as the main quantitative value, there is currently
no clear difference between any of the capture technologies and all could be competitive in the future
once successfully demonstrated. The main factors influencing total costs are fuel and investment costs.

Early strategic planning of large-scale CO2 transport infrastructure is vital to reduce costs

Clustering plants to a transport network can achieve significant economies of scale, in both CO2 transport and CO2 storage in larger reservoirs, on- and offshore. Large-scale CCS therefore requires the development of a transport infrastructure on a scale matched only by that of the current hydrocarbon infrastructure. As this will lead to greatly reduced long-term costs, early strategic planning is vital – including the development of clusters and oversized pipelines – with any cross-border restrictions removed.

A risk-reward mechanism is needed to realise the significant aquifer potential for CO2 storage

Location and type of storage site, reservoir capacity, and quality are the main determinants for the costs of CO2 storage: onshore is cheaper than offshore; depleted oil and gas fields (DOGF) are cheaper than deep saline aquifers (SA); larger reservoirs are cheaper than smaller ones; high injectivity is cheaper than poor injectivity.

Given the large variation in storage costs (up to a factor of 10) and the risk of investing in the exploration of SA that are ultimately found to be unsuitable, a risk-reward mechanism is needed to realise their significant potential and ensure sufficient storage capacity is available – in the time frame needed.

CCS requires a secure environment for long-term investment

Based on current trajectories, the price of Emission Unit Allowances (EUAs) under the EU Emissions Trading System will not, initially, be a sufficient driver for investment after the first generation of CCS demonstration projects is built (2015-2020).

Enabling policies are therefore required in the intermediate period – after the technology is commercially proven, but before the EUA price has increased sufficiently to allow full commercial operation. The goal: to make new-build power generation with CCS more attractive to investors than without it.

© 2025 Zero Emissions Platform. All rights reserved.
Made with Conviction by MOJO.